2011 Construction Projects
From Sturtevant
[edit]
2011 Pavement Project
Resurfacing of 92nd & 93rd Street
- 92nd Street will be resurfaced from Chandler Avenue to Hulda Drive.
- 93rd Street will be resurfaced from Durand Avenue to Hulda Drive.
- Work on the project consists of base repairs, manhole repair/adjustments, sanitary sewer spot repairs, pulverizing, new asphalt installation, and sump pump discharge line.
- Work on the Project will begin on Tuesday, May 31st
- Work is scheduled to be completed by Friday, July 22nd
- Emergency contact for this project is Payne & Dolan at (262) 366-5345
CLICK HERE TO VIEW START NOTICE.pdf
Chandler Avenue
- Chandler Avenue will be resurfaced from 90th Street to 95th Street.
- Work on the project consists of base repairs, manhole repair/adjustments, sanitary sewer spot repairs, pulverizing, and new asphalt installation.
- Work on the Project will begin on Tuesday, May 31st
- Work is scheduled to be completed by Friday, July 22nd
- Emergency contact for this project is Payne & Dolan at (262) 366-53405
CLICK HERE TO VIEW START NOTICE.pdf
2011 Water Main Relay Project-Racine Water Utility
- The Racine Water Utility will relay the water main on Hulda Drive from 93rd Street to 97th Street.
- Contact the Racine Water Utility at (262) 636-9185 for more information.
Storm Water Detention Pond & Sanitary Sewer Line-Highway 11 & Highway H
- A storm water detention pond and sanitary sewer line will be constructed on the along the southside of Highway 11, west of the railroad tracks.
- The purpose of the construction of the pond is to control rain waters from overloading the storm water system that runs from Hulda Drive west.
2011 Sidewalk Repair Project
- The Village of Sturtevant will be again marking sidewalks in need of repair.
- Sidewalks targeted for replacement will be marked with a white dot.
- Residents are encouraged to replace or fix sidewalks that are in need of repair.

